Welcome to Bajothang

Find your Dreams here

You Just don't make your Dream here, You also enjoy making it

We have the best sports facilities in Wangdue Valley

Everyday you learn a lesson that will Change your life

Winning Doesn't always mean moving forward...

Failing is not Shame, Failing to rise after falling is...

We rose from Ashes, and you will learn to o rebuild lives from pieces

Showing posts with label Development. Show all posts
Showing posts with label Development. Show all posts

What is this i-School all about?


Kailash Shongbhen Rai.
M.Sc. (Organic Chemistry), B.Sc. PGCE, PGCTIS,    ANC.
Bajothang Higher Secondary School.

H
onorable Prime Minister, His Excellency Tshering Tobgye envisaged an ICT enabled knowledge generating, educated citizens in our society, at par with anyone current, progressive and productive. The result; i-School project was conceived, designed and devised with-in a very short gestation period with a huge dream. This dream will be one of the most revolutionary in the history of Education System of Bhutan. This little migration from chalk and talk to nearly Si-Fi mode of high end technological teaching learning system is by itself an achievement. What was Neil Armstrong’s foot to moon could be i-School project to our Education System. Its small but its very very big!!!
The Ericsson Company has undertaken this project as a Corporate Social responsibility to nurture and realize Honorable Prime Minister’s vision. The high end gadgets, state of the art facilities like Eagle eye cameras, smart board, i-podium, document cameras, AV systems, smart panels, laptops, smart projectors, logistics and engineering were provided by Ericsson. Co-laterally, Bhutan Telecom and Druknet are other two stake holders, who provided with Fiber Optic lines with 10 Mbps band high-speed Internet services to enable seemingly real-time, online video conferencing facilities, let alone internet aspects. They are also responsible for providing professionals for commissioning of fiber optic lines, splicing, grafting and terminating at desired locations, installing media converters, smart routers and gate keepers, assigning them with IP addresses and securing them with leak proof ambience.
This is in pilot phase with the project encapsulating six schools at different locations. Pelkhil School in Thimphu is classically named as Master School. This is being the nodal point, from where teaching and delivery of lesson takes place. The lesson delivered are being captured by the cameras and are served to other five classes at participating schools online and real-time; Tendruk HS School, Bajo HS School, Khuruthang MS School, Khatshadrapsu MS School and Phuntsholing MS School. And also the lesson is being recorded and archived at one of the data-centers servers at Druknet. The proposal for formation of content moderating and editorial board would allow live streaming of the classes to the internet, thus allowing concept of truly public and global viewing to come in prospective in future.
The classes are normal except that single teacher from one point can reach hundreds of students at geographically different locations through video conferencing facilities. All these happen on a jiffy, real time online and face-on. As of now Chemistry, Physics, Mathematics and English are being taught over this provision.
Apart from the regular curricular lessons, these schools may convene meetings and conferences, seminars, to discuss various aspects of this system of teaching-learning experiences. They also can collaborate and invite guest lecturers from any corner of the world in near future. My imagination is an erudite professor from Princeton or Havard, Standford or MIT talking to our students. I know I am dreaming, but it could not be very far away, anyway.
I have seen billions of glitters in students’ eyes through my short period of teaching life. This time, I have seen brighter ones as well. Students are excited, engaged and collaborative in learning not only lessons taught but also cultural exchange, sharing of ideas, quipping of wits, smarting each other and on top of this pyramid stands the rippling fractal of connecting friendship.
The formal launching of this program took a fly on March 29, 2014 at 9:15 AM at Pelkel School, Thimphu. This occasion was graced by Honorable Prime Minister, Dignitaries from Ericsson, CEO Bhutan Telecom, Director of Department of School Education and professionals. It was a moment, yet another step towards modernity in all its right. A moment when teachers started burying their boards and chalks, tending to nostalgic memories of them.

And yet another historic moment of this journey was the providential gracing of the i-class by the His Majesty, the Druk Gyalpo and Her Majesty, the Gyaltsuen at Tendruk HS School, while the English class was delivered from the Master School on the April 1, 2014. By itself, it is an inspiration to walk little taller.



A posteriori:  i-School solution is not about replacing contact teaching with technology. It’s a tool to enliven teaching – learning process through collaborative pool of expertise to give edge to teaching profession. 

Sherig Collection in Bajothang

Bajothang eLearning Club is a new club founded by school computer teacher, Passang Tshering with 18 student members. The club aims to explore way to bring eLearning concept to school and build eLearning resources. The vision and action plan of the club could be read on their blog.
The new club, though with smart concept, was fighting endless limitations. Coincidentally, Rigsum invited the club master to attend the introductory presentation and demo of Sherig Collection in Thimphu, which was a blessing to the new club.
Read about the Sherig Collection in the following page from Kuensel, which also contain words of the school club master.
Kuensel Page

The whole collection is with the eLearning Club and could be easily shared with any school or individual during the school hours. While our own students and teachers wishing to avail the resources can visit the computer lab where at least 10 computers are equipped with the collection as of today.
The club plans to set up Wiki Booths in library and WiFi Park to make the resources easily accessible by the students.

Proposal for Realignment of facilities and addition work for safety of School in 11th 5 year plan


Background

Bajo School started in 1997 as a junior high school and in 2003 it was upgraded as higher secondary school with limited infrastructural facilities. Previously we had classes IX to XII with a total enrollment less than 450 students, and now we have a little less than 800 students with classes from VII to XII. The student number increased drastically and we had to request PHPA-I for additional class rooms to accommodate the increasing number of students and the construction has started since June 2012 and is expected to be completed by next year 2013. With completion of the constructions our projection in the near future is more than 1000 students after the completion of the new class rooms provided by PHPA-I. The school being centrally located in the dzongkhag has to provide service to the locality and as well for the children from upcoming PHPA –I and II project in the near future.  In terms of facilities like library books and other necessary equipments in the laboratories, we still are in short. We have limited budget for library up gradation and laboratory materials.

Bajo HSS being centrally located there is tremendous pressure on the facilities as most of the workshops, meetings, and recreational activities are carried out in the school MP Hall. The maintenance and the sanitation & hygiene in and around the hall is always at stake especially when recreational program are held.

Bajo HSS being located at Basin of Punatsangchu River is posing serious danger to life and the settlement on regular basis in downstream starting from Lunana to kalikhola. As per the Disaster Management mapping, school campus lies in the danger zone as shown in the master plan map. The chances of the flood and water volume rising suddenly is not predictable, which, if we are not careful can become a threat to the life and property any time. Royal Government through various agencies is doing everything within its means through various projects like early flood warning system, lake mitigation project, awareness campaigns, programmes through BBS regarding the risk involved and many more.
2012 Master Plan Map
In addition to the above dangers, the main road from Bajo town towards Khuruthang runs above the school campus all across having paddy field and settlement above the road. The drainage along the road is very small to withstand the capacity of the out flow during the monsoon. The school is flooded with over spill water every time it rains. Also it is noted the outlets of drains are sent in to the school campus in as many as three locations which is creating flood in the campus. Carrying out the proper preventive measures needs to be put in place, so that similar and more dangerous problems do not arise in the future posing risk to the life and the property in the school.

Additional Proposals to be carried out in 11th 5 year plan

Sl. No
Name of the Work
Reason for work
Estimated cost
Agency to carry out the work

01

Flood protection wall along the River bank (2.5m in height concrete wall) & (1.5m in height concrete wall) along the road as is porous campus creating disturbance in the school.
As the school lies in red and yellow zone as per disaster mapping pre preparation of safety measures is an urgent need for the school’s safety. Also school is in the receiving end of spill over water during monsoon of the settlement above the road & there is lot of disturbance caused due to porous campus.




2.00 million
PHPA-II could be requested for the work as they are more specialized in the river protection work as a social cooperative responsibility as this school will cater to the needs of PHPA employees in future.



02

Realignment of the entrance road to the school with new school gate from above Hospital along the fencing.
The present entrance gate is from the other end of the campus when 90% settlement is towards Bajo town. The narrow road above is posing risk all the time and traffic is clogged in peak hours. This will ease the traffic and safety of the students as well.


0.500 million


Package could be attached with protection walls as the site is in a same location
        OR
Include in 11th 5 year plan



03
Dismantling of village house, Expansion of parking with retention wall on the edges and protection wall for principal’s quarter.

Once new Adm block is complete there will be enough rooms for stores. Old village house is just housing few stores and is occupying huge area that could be extended for parking.



0.200 million



To be include in 11th 5 year plan


04


Construction of new MPH
Bajo HSS being centrally located there is tremendous pressure on the facilities recreational activities that are needed to be carried out in the school MP Hall as present one cannot accommodate all students.



13.00million



To be include in 11th 5 year plan


05


Swimming pool
Due hot weather and punatsangchu nearby there is temptation for students to go for swimming and were losing students year after year in the river. This facility could save lives.


1.00 million


To be include in 11th 5 year plan

Related Posts Plugin for WordPress, Blogger...